Work on the roof structure continues. Along the walls, the steel framing to support the interior wall materials is visable.
Newer Post
Older Post
Home
Links
CCLS Web Site
Search the Catalog
Blog Archive
►
2009
(17)
►
May
(9)
►
April
(1)
►
March
(3)
►
February
(3)
►
January
(1)
►
2008
(35)
►
December
(1)
►
November
(1)
►
October
(7)
►
September
(4)
►
August
(4)
►
July
(3)
►
June
(2)
►
May
(6)
►
March
(1)
►
February
(6)
►
2007
(69)
►
December
(7)
►
November
(5)
►
October
(8)
►
September
(1)
►
August
(6)
►
July
(2)
►
June
(3)
►
May
(9)
►
April
(4)
►
March
(5)
►
February
(4)
►
January
(15)
▼
2006
(40)
▼
December
(6)
Roofing materials are installed
Stone work continues on the front porch
Looking up... from the inside
Steel girders are lifted into place
A front porch takes shape
Steel overhangs and porch area
►
November
(14)
►
October
(4)
►
September
(3)
►
August
(3)
►
July
(2)
►
June
(2)
►
May
(1)
►
April
(3)
►
January
(2)
►
2005
(9)
►
December
(1)
►
August
(3)
►
July
(1)
►
June
(1)
►
March
(2)
►
January
(1)
►
2004
(1)
►
July
(1)
►
2003
(2)
►
March
(1)
►
February
(1)
►
2002
(2)
►
November
(1)
►
August
(1)
►
2001
(2)
►
February
(2)