Tuesday, February 27, 2007

Hardieplank Siding


Workers reach to install the Hardieplank siding above the windows on the east side of the building.

AC Ductwork Installations

AC ductwork is being installed along the ceiling. The opening at the far end is the entrance to the library.

Tuesday, February 20, 2007

Windows have arrived


This is a view of one of the smaller side windows.

Monday, February 12, 2007